Seven things we need to size it
- Maximum operating voltage and system earthing
- Prospective fault level and required short circuit withstand
- Load to be carried, plus any expected overload duration
- Route length and permissible voltage drop
- Installation method — buried, ducted, tray, conduit or free air
- Ambient and ground temperature, soil thermal resistivity, grouping
- Flame retardance, low smoke or halogen free requirements